transformal GmbH:DS-GVO: Difference between revisions

From transformal GmbH
(Redirected page to transformal GmbH:Imprint)
Tag: New redirect
 
(18 intermediate revisions by the same user not shown)
Line 1: Line 1:
[[de:transformal GmbH:DS-GVO]]
#REDIRECT [[Transformal_GmbH:Imprint]]
On processing data in accordance with Art. 13 of the German Datenschutz-Grundverordnung (DS-GVO):
 
== Person responsible and data protection officer ==
The person responsible for keeping these data read and the data protection officer is
: Olaf Langmack
: transformal GmbH
: Gitschiner Straße 91
: 10969 Berlin
 
== Data and log files ==
 
'''Which data is processed for which purpose?'''
 
With every access, data is temporarily stored:
* Date and time of access
* IP address
* Host name of the accessing computer
* Site from which the access ocuured
* Remote sites accessed in the course of a visit
* Pages called in the course of a visit
* Message indicating whether the retrieval was successful
* Amount of data transferred
* Data on the browser type and version used
* Operating system
The temporary storage of data is necessary to provide this site. Further storage in log files is to ensure its functionality and security. The data are processed on the basis of Art. 6 Para. 1 Letter f DS-GVO. The data are deleted as soon as they is no longer required to achieve the
purpose for which they were collected. This is the case when the respective session has ended. Log files are stored for up to 24 hours and are only accessible to administrators. After that, they are only available indirectly via the reconstruction of backups and are permanently deleted after four weeks.
 
==Rights of those affected==
; Right to disclosure
You can request the disclosure in accordance with Art. 15 DS-GVO about your personal data that we process.
; Right to object
You have the right to object for special reasons (see point II).
; Right to rectification
If the data concerning you are no longer correct, you can request
rectification in accordance with Art. 16 DS-GVO. If your data is
incomplete, you can request completion.
; Right to erasure
You can request the erasure of your personal data in accordance with
Art. 17 DS-GVO.
; Right to restriction of processing
You have the right to request restriction of the processing of your
personal data in accordance with Art. 18 DS-GVO.
; Right to complain
If you believe that the processing of your personal data violates data
protection law, you have the right to complain to a data protection
supervisory authority of your choice in accordance with Article 77,
Paragraph 1 of the DS-GVO. This also includes the data protection
supervisory authority responsible for the controller:
[https://www.datenschutz-berlin.de/ State Commissioner for Data Protection and Freedom of Information Berlin].
; Right to data portability
If the requirements of Art. 20 Para. 1 DS-GVO are met, you have the
right to have data that we process automatically on the basis of your
consent or in fulfillment of a contract handed over to you or to third
parties. The collection of data to provide this site and the storage
of log files are essential for the operation of this site. They are
therefore not based on consent in accordance with Art. 6 Para. 1 Letter a
DS-GVO or on a contract in accordance with Art. 6 Para. 1 Letter b DS-GVO,
but are justified in accordance with Art. 6 Para. 1 Letter f DS-GVO. The
requirements of Art. 20 Para. 1 DS-GVO are therefore not met in this respect.
 
== Right to object in accordance with Art. 21 Para. 1 DS-GVO ==
Sould you store personal data on this site, you have the right to object to the processing of these data based on Article 6 Para. 1 Letter f DS-GVO at any time for reasons related to your particular situation. The provider will then no longer process the personal data unless they can demonstrate compelling legitimate grounds for the processing which outweigh the interests, rights and freedoms of the data subject, or the processing serves to assert, exercise or defend legal claims. The collection of data to provide the site and the storage of log files are essential for the operation of the site.
[[Category:Description]]
[[Category:Semi-finished work]]
[[Category:Concept]]

Latest revision as of 14:29, 20 September 2025